Facebook Pixel

Add "CT Compare" Widget via Appearance > Widgets > Compare.

Last steel beam at airport addition gets applause

By Mike in with 0 Comments

The last steel beam in the frame of the $1 billion “Green Build” addition to San Diego International Airport was lifted into place this morning, lifted easily into the sky by a 250-foot crane as if it were from a child’s Erector set.

Last steel beam at airport addition gets applause

By Mike in with 0 Comments

The last steel beam in the frame of the $1 billion “Green Build” addition to San Diego International Airport was lifted into place this morning, lifted easily into the sky by a 250-foot crane as if it were from a child’s Erector set.