The last steel beam in the frame of the $1 billion “Green Build” addition to San Diego International Airport was lifted into place this morning, lifted easily into the sky by a 250-foot crane as if it were from a child’s Erector set.
The last steel beam in the frame of the $1 billion “Green Build” addition to San Diego International Airport was lifted into place this morning, lifted easily into the sky by a 250-foot crane as if it were from a child’s Erector set.