The selection Thursday of a “noninvasive” palm type to grace the downtown waterfront completed the final design detail before construction can proceed on the $29.6 million first-phase makeover of San Diego’s proverbial “front door.”
The selection Thursday of a “noninvasive” palm type to grace the downtown waterfront completed the final design detail before construction can proceed on the $29.6 million first-phase makeover of San Diego’s proverbial “front door.”